Friday, March 17, 2017

Project Management Tips

Scrum vs Kanban

Similar:
-Pull system

Scrum:
- 2 weeks/sprint, has backlog
- daily 15 min meeting
- uncomplete -> Backlog
- Sprint review, retrospective (next sprint more effective)

Kanban:
- continuous, no backlog
- Daily stand-up meeting, demo, retrospective

WaterFall vs Agile
Depends on Predictability
-> Predictable = Waterfall
-> Less confidnet = Agile


Daily stand-up

Old model: Yeserday-Today-Blockers
- Individuals don't listen, but prepare for presentation.
Better model: Walking the Board (End to Beginning)
- Dont focus on individual, but focus on the board.








Networking Lab Notes

Show current switch configuration (password, interfaces)
# show running-config

Show all interfaces
# show int br


Assign name to switch
config# hostname S1


Secure access to USER
c# line console 0
cl# password pass123
cl# login


Secure access to PRIVILEGE
c# enable password pass123
c# enable secret pass123


Encrypt USER and PRIVILEGE
c# service password-encryption


MOTD
# banner motd "Blah"


Configure Telnet
c# line vty 0
cl# password pass123


Configure Default Gateway
c# ip default-gateway xxx.xxx.xxx.xxx


Enable Router to forward IPv6 Packet
c# ipv6 unicast-routing


Configure Interface IP
c# int vlan1
cl# ip address x.x.x.x y.y.y.y
cl# ipv6 address 2001:x:x::/64


Configure Serial Routing between Routers
c# ip route 0.0.0.0 0.0.0.0 s0/0/0
c# ipv6 route ::/0 s0/0/0


Configure Description
cl# description "message"


Prevent Translating Domain Server
c# no ip domain-lookup